His Majesty's Theatre Perth schedule & tickets | GoComGo.com

His Majesty's Theatre Perth (Perth, Australia)

Filter By
When Are You Traveling

His Majesty's Theatre Perth

His Majesty's Theatre Perth

His Majesty's Theatre is an Edwardian Baroque theatre in Perth, Western Australia. Constructed from 1902 to 1904 during a period of great growth for the town, the theatre is located on the corner of Hay Street and King Street in Perth's central business district. At the time the theatre was opened, it was the largest theatre in Australia, and had seating for over 2,500 people. It is also thought to be the first reinforced concrete building constructed in Perth. Over its life, the theatre has hosted large-scale musicals, ballet, opera, Shakespearean plays, and many other events.

Construction

At the turn of the 20th century, Perth was experiencing a period of high growth as a result of the Western Australian gold rush. The prosperity which resulted from this boom led to the construction of increasingly opulent baroque buildings. Local politician Thomas Molloy had commissioned the Metropole Hotel in 1896 and adjoining 1200-seat Theatre Royal in 1897, which included the first fully equipped theatre in the growing town. Soon after the completion of that complex, Molloy asked the same architect, William G. Wolf, to design an integrated theatre and hotel complex to be named His Majesty's Theatre and Hotel in honor of the recently crowned King Edward VII. The site selected for this new theatre was the corner of King Street and Hay Street, which in 1896 had been home to "Ye Olde Englishe Faire". In June 1902, Molloy applied to the Perth Licensing Court for planning permission to construct the theatre, and when he finally received permission, he promised completion within a year.

A call for tenders to construct the complex was put out, and the winning tender was by Friederich Wilhelm Gustav Liebe, an immigrant from Saxony who had previously constructed the Bulgarian Houses of Parliament in Sofia and worked on the Budapest Opera House. The tender price was £46,000, of which £43,000 was the cost of the building alone. The construction contract between Molloy and Liebe was signed in November 1902, and Heinrich Schmidt was appointed as a foreman for Liebe. Deep excavation of the site for the building's foundations and basement started almost immediately.

During construction, questions were publicly raised about the stability of the building's foundations in light of the water table on the site and the presence of a subterranean stream. Liebe conferred with the architect and engineers before developing a revised design that featured drains to divert running water. Liebe presented the modified plans to Molloy and proceeded with them, assuming that he had the consent of Molloy. Construction progressed, and the building was completed on schedule. When the time finally came for Molloy to pay Liebe for the construction, a dispute arose as to who should be liable for the extra £17,000 incurred in remedying the structural defect. Molloy was reputed to be one of the most litigious businessmen in Perth and refused to pay higher than the original agreed price, on the basis that the contract required his written approval for extra work to be carried out. Liebe pursued him through the courts all the way to the High Court and Privy Council. The Privy Council eventually ruled in favor of Liebe, however, the legal costs he had incurred were exorbitant.

After resolving some last-minute objections by the Central Board of Health to the building's fire safety, the theatre was officially opened at 8 pm on Christmas Eve in 1904 by Sylvia Forrest in the presence of her uncle, former Premier John Forrest. Opening night saw "Pollard's Adult Opera Company" performing The Forty Thieves, however, the choice of opening date was an unfortunate one and the opening night was not a sell-out.

Architecture

At the time of its opening, His Majesty's Theatre was the largest theatre in Australia, and also featured the country's largest stage and highest fly tower. The complex was constructed with reinforced concrete and was the first reinforced concrete building in Perth and, possibly, in Australia. The structure is 4-storeys tall, and its features were influenced by 19th-century English and European theatres. It has been described as "a fine example" of Federation Free Classical or Edwardian Baroque architecture.

The building as designed by Wolfe was grander than Molloy's Theatre Royal complex and featured a 65-room hotel separated from the theatre by internal iron doors. The hotel had billiard rooms, parlors, and six bars to serve the patrons of the theatre. The building used 272 tonnes (600,000 lb) of iron and steel, 3.75 million locally made bricks, imported marble, Minton tiles, and Castlemaine slate. An electric lift led to the roof, where an observation platform had panoramic views over the town.

The auditorium contained a proscenium arch, with a raked stage 20 by 23 meters (66 by 75 ft) in size. The auditorium measured 23 by 21 meters (75 by 69 ft), and its original capacity was 2584 people in three tiers. The interior of the theatre was a typical Edwardian horseshoe shape to bring the audience closer to the performers. It featured stalls (seating 974), a dress circle (seating 540), an upper gallery (seating 1,074), and private boxes.

The theatre incorporated several cooling features. Four small waterfalls were located on either side of the proscenium arch, intended to cool the audience in tandem with electric fans and a retractable dome in the ceiling. The dome was split down the middle, with each half sliding to either side to open. The dome was decorated in imitation of an umbrella, with panels of gold and silver with scrollwork embellishment. The artificial waterfalls were removed early in the life of the theatre.

The exterior of the theatre was originally lined with two-level verandah balconies, which provided relief to the imposing walls. These were removed in 1947-48 because authorities considered that the proximity of the supporting pillars to the road constituted a traffic hazard. As a result, there is a disparity between the ornamentation at the top of the building's facade and the lower three stories, which were previously obscured by the balconies.

Subsequent history and renovation

Over its first 70 years of life, His Majesty's played host to the traditional Shakespearean plays, opera, political rallies, boxing matches, and movie screenings. It was particularly noted for its excellent acoustics. During World War II, the theatre functioned chiefly as a cinema due to travel restrictions on touring companies.

Original proprietor Thomas Molloy leased the theatre to others, including Ben and John Fuller, and local producer Anita Fitzgerald. Another lessee of the theatre, J. C. Williamson Ltd, is said to have made His Majesty's Theatre the Perth home of musical theatre. The theatre was renovated in 1912 at a cost of £9,000, and again in 1948 at a cost of £11,000. The latter renovation included new backstage electrical fittings and may also have been the time the verandah balconies were removed from the street frontage of the theatre. In 1952, the theatre was leased by the Edgley family and used for "Russian spectaculars". The theatre was redecorated for Edgley and Dawe in 1960, this time at a cost of £7,000. Edgley went on to purchase His Majesty's in 1969. After the Perth Entertainment Centre was completed in 1974, the Edgley productions shifted there, and the newly completed Perth Concert Hall was also favored as a performance venue due to outdated equipment and general disrepair at His Majesty's. The theatre was sold in 1976 to Sir Norman Rydge.

Following several years with an uncertain future and a public campaign to save it, in 1977 the theatre was bought by the Government of Western Australia. Adhering to an April 1974 election promise to retain and restore the theatre in conjunction with a new Art Gallery and Cultural Centre, in 1977 the Charles Court Coalition Government undertook a A$10.5 million refurbishment. The final performance in the theatre before closing for renovation was the Gilbert and Sullivan Society's 25th-anniversary production of Iolanthe. The refurbishment took three years and was overseen by architects Hill and Parkinson.

The refurbishment saw significant structural changes made to the hotel/theatre complex. Initially, it was suggested that the theatre be largely remodeled to a two-tier concert hall design. However, architect Peter S. Parkinson resisted this push to fundamentally alter the design of the theatre and a sympathetic restoration was instead favored. Within the auditorium, it was found that the reinforced concrete floor of the stalls was substandard and was completely replaced. Additionally, on one of the upper levels a wall was discovered which was not supported by a beam in accordance with the building plans. The much-maligned supporting pillars were shifted back to improve sight-lines for the audience. The raked stage was replaced with a new flat one, and the proscenium arch widened by 2 meters (6.6 ft) and decorated with plaster moldings of the original arch. The pressed-metal ceiling was also replaced with a plaster-molded copy. The sliding dome in the roof was permanently sealed and redecorated to match its original design from 1904. The orchestra pit was also expanded and new lighting and counterweights installed.

The hotel portion of the complex was separated from the theatre and renovated to provide a home for the resident West Australian Opera and West Australian Ballet, as well as backstage facilities for touring companies. A separate building was constructed to the rear of the theatre to house new dressing and rehearsal rooms, as well as a new air conditioning system.

The theatre's grand marble staircase was relocated to provide a larger foyer. It had its marble treads replaced but retains the original balustrade. The former Sportsman's Bar of the hotel was converted to function as the theatre's new box office, and the side entrance from King Street was made an emergency exit. Soundproofing was also installed within the building's walls to reduce traffic noise.

During the renovation, there was debate about the best way to manage the theatre in the future. The favored option was to establish a trust to operate it, which could focus on best serving the arts rather than worrying about the commercial viability of productions. However, on 8 February 1979, Premier Court announced that His Majesty's would be run by TVW Enterprises Ltd, the owner of the rival Perth Entertainment Centre. This led to public outcry over potential conflicts of interest, and in June 1979 TVW declined to manage the theatre. The Perth Theatre Trust was instead created, and it took over the running of the theatre. His Majesty's Theatre finally reopened on 28 May 1980, with a reduced seating capacity of 1250.

His Majesty's Theatre has long been recognized as an important piece of Western Australia's history: in 1978 it was entered onto the Register of the National Estate. On 8 April 1994, it was included as an interim entry on the Western Australian Register of Heritage Places, before receiving a permanent entry on 16 December 1994. The theatre was named a State Heritage Icon in December 2004, and since February 2001 has housed a Museum of Performing Arts.

In 2004 the theatre celebrated its centenary and events included the publications of David Hough's volume of history. In 2006 the theatre became 'twinned' with the only other remaining theatre of the same name in the world, His Majesty's Theatre in Aberdeen, Scotland. Perth's His Majesty's Theatre is believed to be the only remaining working Edwardian theatre in Australia and is presently managed on behalf of the Perth Theatre Trust by AEG Ogden, which also manages the Perth Concert Hall.

In 2008, Savcor (a company that specializes in restoration techniques for concrete and steel) was contracted to do a detailed survey of His Majesty's Theatre. This survey revealed a number of defects on the facades that potentially rendered them unsafe. In 2010, a project involving the restoration of damaged cornices and corbels was carried out. Damaged decorations were replaced by using modern repair mortars which produced perfect reproductions. Mick Summers was in charge of crafting the ornate flowers around the façade. This was achieved with the help of latex molds which were taken from the original form. Due to structural deterioration, many of the balconies had to be rebuilt completely. The balconies' many features, including clamshell base, curved profile, and plaster features, required many different processes to recreate the original. Both latex molding and traditional construction techniques were used to make sure the balconies remained durable.

...Read more
...Less detail
Top of page